Central Gas System Gas Plant Machinery Equipment
ETR Central Gas System Gas Plant Machinery Equipment Description
The medical Central Gas Supply System plays a significant role in modern hospitals. The appropriate design and setup of medical gas equipment are essential for the hospitals to ensure medical quality, as well as to save the lives and ease the pain of patients in a timely manner. The medical center gas supply system is mainly composed of the gas station, Bed Head Unit, gas terminal, electrical system, medical calling system, medical pipelines and auxiliary equipment system.
No. | Model | Capacity (NM3/hr) | Compressed Air Source (M3/min) | Air Compressor (KW) | Buffer Tank |
1 | ETO-01 | 0.8-1.2 | 0.16-0.24 | 2.2 | 50L |
2 | ETO-02 | 1.5-2 | 0.24-0.32 | 3 | 100L |
| | 2.1-2.5 | 0.35-0.45 | 4 | 100L |
3 | ETO-03 | 2.5-3 | 0.63-0.75 | 5.5 | 300L |
4 | ETO-05 | 3.5-5 | 0.9-1.2 | 7.5 | 300L |
5 | ETO-10 | 5.5-7 | 1.38-1.75 | 11 | 500L |
| | 8.0-10 | 2.0-2.5 | 15 | 500L |
6 | ETO-15 | 11-12 | 2.8-3.0 | 18.5 | 1000L |
| | 13-15 | 3.25-3.75 | 22 | 1000L |
7 | ETO-20 | 16-17 | 4.0-4.24 | 26 | 1500L |
| | 18-20 | 4.4-4.8 | 30 | 1500L |
8 | ETO-30 | 21-25 | 5.25-6.0 | 37 | 2000L |
| | 26-30 | 6.5-7.5 | 45 | 2000L |
9 | ETO-40 | 32-36 | 8.0-9.0 | 55 | 2500L |
| | 38-42 | 9.5-10.5 | 55+ | 2500L |
10 | ETO-50 | 45-50 | 11-12.5 | 75 | 3000L |
ETR Central Gas System Gas Plant Machinery Equipment Advantage
- Highly efficient molecular sieves, making oxygen generation more efficient
- Unique startup concentration maintenance function
- Imported muffler, achieving an operating noise of less than 85dB(A)
- LCD touch screen interface, making setting of operating parameters more convenient
- Integrated pipeline process, providing excellent air tightness
- Intelligent control, enabling remote data transmission.
ETO-15 Oxygen Generator |
Item | Specification | Remark |
Oxygen Capacity | 1-50Nm3/h | Normal/Standard Condition |
Oxygen Purity | 93%±3% | |
Oxygen Delivery Pressure | 0-4bar | Adjustable |
Power Consumption | 0.1-0.2kW | 220V, 50Hz @1Phase |
Dimensions (mm) | / | Including buffer tanks. Dimensions are approximate. |
Weight (kg) | / | Weight is approximate. |
Noise Level | ≤85dB(A) | 1 meter away |
Compressed Air Specifications |
Air Flow Rate Required | As Demand | Capacity Of The Clean & Dry Air after Pretreatment |
Pressure | ≥7bar | Gauge |
Oil residual Content | ≤0.008PPm | |
Particles Size | ≤0.01m | |
Pressure Dew Point | + 3ºC | |
Air Temperature | 5-45 Deg. C | |
Design Working Conditions |
Relative humidity | 20%-100% | |
Dust Content In The Air | ≤20mg/m3 | |
H2S,SO2 Content In The Air | ≤5ppm | |
CO2 Content In The Air | ≤250ppm | |
CnHm Content In The Air | ≤20ppm | |
Acidic Gases | Less Than Stimulus Content And Without Erosive Gases | Self-governed Room For Air Separation Plant And Far From Acidic Environment is Strongly Recommended |
5. Quality Control Process
ETR Enigineering & Technology,clients can be sure of the quality of ETR solution. ETR uses only the best suppliers and components. And all oxygen generators are tested & commissioned by professional Experts to make sure everything is qualified before they leave the factory.
COMPANY INTRODUCTION
Eter founded in 2003 and listed on the NEEQ (National Equities Exchange and Quotations) with the stock code of 839074 in 2016.
Eter is the one of most qualified producers in China market. In addition to the International market, the ETR products have been exported to Southeast Asia, Africa, the Middle East and other overseas markets.
Eter is UN qualified product supplier.
AFTER SALES SUPPORT
Warranty
The Guarantee/Warranty Period shall be a period of twelve months after on-site startup & commissioning or eighteen months after shipment, whichever occurs first. If any trouble or defect, originating with the design, material, workmanship or operating characteristics of any Goods, arises at any time during GUARANTEE/WARRANTY period, ETR shall, at his own expense and as promptly as possible, make such alterations, repairs and replacements.
On-Site Support
ETR can do paid services of on-site startup, commissioning, installation supervision, training, by providing purchaser with the services of qualified English-speaking
engineer at site. ETR shall obtain all permits and licenses required to perform the services under this Agreement.
FAQ
1. Are you manufacturer or trade company?
A:We are the manufacturer of Medical Equipment, founded in 2003.
2. What terms of payment you use?
A:T/T, L/C etc.
3. How long is your delivery time?
A:Generally it is 5-10 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.